In Phase I, Suffolk will collaborate with the Gensler architectural group, and will focus on timing, logistics and costs for the project as a whole. Once plans are finalized, the build of the 295,000 square foot project will begin. Read More: https://cre.nerej.com/ge-selects-suffolk-construction-const-manager-new-boston-hq/
Read the full post from the New England Real Estate Journal.